{"id":16440,"date":"2023-11-19T15:02:41","date_gmt":"2023-11-19T20:02:41","guid":{"rendered":"https:\/\/supertech-inc.com\/staging\/2023\/11\/19\/shu-community-theatre-supertechs-latest-project-copy\/"},"modified":"2023-11-19T22:30:38","modified_gmt":"2023-11-20T03:30:38","slug":"hotchkiss-school-supertech-design-build","status":"publish","type":"post","link":"https:\/\/supertech-inc.com\/staging\/2023\/11\/19\/hotchkiss-school-supertech-design-build\/","title":{"rendered":"The Hotchkiss School"},"content":{"rendered":"<h4 style=\"text-align: center;\"><em><strong>A Supertech Design Build Project !!<\/strong><\/em><\/h4>\n<figure id=\"attachment_16255\" aria-describedby=\"caption-attachment-16255\" style=\"width: 1020px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16255 size-large\" src=\"https:\/\/supertech-inc.com\/staging\/wp-content\/uploads\/2023\/11\/WG1-Hotchkiss-VIP-Medium-SCN_1442-1-1485x1024.jpg\" alt=\"\" width=\"1020\" height=\"765\" \/><figcaption id=\"caption-attachment-16255\" class=\"wp-caption-text\">Walker Auditorium<\/figcaption><\/figure>\n<p style=\"text-align: center;\">Supertech is pleased to announce the completion of another design build project for<br \/>The Hotchkiss School.<\/p>\n<p style=\"text-align: center;\">As part of the Working Group 1 design team, Supertech provided design, equipment, and installation services for all of the theatrical systems for the theater, including lighting system upgrades, motorized line shaft rigging, and updated LED house light systems for the project.<\/p>\n<figure id=\"attachment_16473\" aria-describedby=\"caption-attachment-16473\" style=\"width: 1020px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16473 size-large\" src=\"https:\/\/supertech-inc.com\/staging\/wp-content\/uploads\/2023\/11\/Hotchkiss-ThreeQuartersTechWide-SCN-1549x1024.jpg\" alt=\"\" width=\"1020\" height=\"765\" \/><figcaption id=\"caption-attachment-16473\" class=\"wp-caption-text\">Tech Galleries and Catwalk<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>A Supertech Design Build Project !! Supertech is pleased to announce the completion of another design build project forThe Hotchkiss School. As part of the Working Group 1 design team, Supertech provided design, equipment, and installation services for all of the theatrical systems for the theater, including lighting system upgrades, motorized line shaft rigging, and [&#8230;]\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[67],"tags":[],"class_list":["post-16440","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/supertech-inc.com\/staging\/wp-json\/wp\/v2\/posts\/16440","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/supertech-inc.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/supertech-inc.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/supertech-inc.com\/staging\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/supertech-inc.com\/staging\/wp-json\/wp\/v2\/comments?post=16440"}],"version-history":[{"count":11,"href":"https:\/\/supertech-inc.com\/staging\/wp-json\/wp\/v2\/posts\/16440\/revisions"}],"predecessor-version":[{"id":16482,"href":"https:\/\/supertech-inc.com\/staging\/wp-json\/wp\/v2\/posts\/16440\/revisions\/16482"}],"wp:attachment":[{"href":"https:\/\/supertech-inc.com\/staging\/wp-json\/wp\/v2\/media?parent=16440"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/supertech-inc.com\/staging\/wp-json\/wp\/v2\/categories?post=16440"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/supertech-inc.com\/staging\/wp-json\/wp\/v2\/tags?post=16440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}